Hi everyone,
I'm relatively new to both this community and the SAP world, I hope I found the right place to ask my question.
We're currently testing the SAP Desktop Connection (SP02) on one of our sandbox systems (SAP_BASIS 731 SP11, CRM 7.0 EHP2) and I managed to install and configure the Netweaver Gateway 2.0 and the CRMGWS component (700 SP04). Everything should be up to date.
Now the synchronization of contacts and appointments seems to be working fine, but whenever I want to synch a task from Outlook to our CRM, I get an error: "ActiveStatusId E0001 is not allowed (Code: 'Sy/530')". I guess the status mapping isn't working correctly but what can I do about it? Does anyone know a fix for this or has a clue what I might have messed up in the configuration? The Customization Package (CRMGWCUS02_0-20011654.ZIP) should be correct.
Thanks in advance!